RMRK is retiring.
Registration is disabled. The site will remain online, but eventually become a read-only archive. More information.

RMRK.net has nothing to do with Blockchains, Cryptocurrency or NFTs. We have been around since the early 2000s, but there is a new group using the RMRK name that deals with those things. We have nothing to do with them.
NFTs are a scam, and if somebody is trying to persuade you to buy or invest in crypto/blockchain/NFT content, please turn them down and save your money. See this video for more information.
Help me please

0 Members and 1 Guest are viewing this topic.

**
Rep: +0/-0Level 58
RMRK Junior
Translate by Reverso:

Hello, good evening or other (to you to choose)
Here is I have a very particular problem on Ace and I am not even on as that can be easily solved.
Then here we are. I have make miscellaneous tutoriaux as you must know him(it) (I hope for it in any case). I would like I could group(include) them in a single project without all to redo.
The solution which I would like it is a way(means) to modify directly dated him(it) for variable, common switches and event (even maps why not).
Example with 2 projects:
My tutoriel PHS uses the switch 01, the variables 1 - 22 and the common event 01
That of the blackjack uses switch 1 - 56, variable 1 in 9 and common 1 to 4.

I whom I would want it is that for example the blackjack is modified to take(set) Switch 1 - 56, variable 1 in 9 and common 1 to 4.

I whom I would want it is that for example the blackjack is modified to take switches following the PHS: 2 - 57 in the end(final), variables become: 23 in 32 and common 2 to 5 in the end(final).
I know that I ask for an impossible mission. The purpose being not to redo everything in zero.

Thank you very much.